RIPTA transit center relocation
Proposed
On August 20, 2026 RIPTA's board voted 6 to 0 to take a new transit center into design, engineering and pricing on a 4.4-acre state-owned parcel facing Francis and Gaspee streets, next to Providence Station and across from Providence Place. Contractor Next Wave Partners. Kennedy Plaza would keep reduced service via the Downtown Transit Connector. The governor's schematic shows 16 bus berths curving along the Francis and Gaspee intersection, west of the station and south of the State House. RIPTA will own the site; it is a tenant at Kennedy Plaza, which the City owns. Next Wave's contract is about $16.9 million. No construction timeline has been stated; the completed design and a cost estimate come back to the board before construction. S5 S16 S16b S27 S28 S29
On the list because the city has proposed it. Not yet verified by the author.
Years out
years out not yet estimated
What it needs first
- Design, engineering, pricing, public engagement and permitting complete, and the proposal with a cost estimate returns to the board for approval; no date stated S5 S16 S29
- Construction contract after board approval S5
- Funding assembled: 2014 transit bond share plus a $25M federal BUILD grant, with state documents describing the bond figures differently ($20.5M recommended, $22M issued) S16b
- Route restructuring settled: which routes move and when S16b
Notes
The buses route to the Francis and Gaspee frontage by the State House and the station. Opposition on record: Kennedy Plaza Resilience Coalition; a former board member urged delay pending a service analysis. Claude's read from Sept 2, unsourced and so not listed as a dependency: the site sits against the station project and a transfer point cannot be sited against a building under unresolved renovation.